Use One Checklist to Connect the Policy File, Property Evidence, and Closing Requirements
An insurance file can look complete while still leaving material questions unanswered. A declarations page may omit controlling endorsements. A replacement-cost estimate may rely on incomplete building data. A lender condition may require different limits or evidence than the current policy provides. The goal is not to declare the insurance acceptable from one document. The goal is to identify what exists, what is missing, what conflicts, and which professional must resolve each issue.
1. Build the complete policy file
Request the current policy package and any available renewal or proposed-policy materials. Do not treat a quote, binder, certificate, or declarations page as the entire contract.
| Document | What to verify | Escalation question |
|---|---|---|
| Declarations and building schedules | Carrier, named insured, property address, building count, effective dates, limits, deductibles, forms, and endorsements | Does every building and insurable interest appear correctly? |
| Policy forms and endorsements | Coverage grants, exclusions, conditions, valuation provisions, sublimits, waiting periods, and amendments | Which endorsement changes the apparent summary? |
| Binder, quote, and certificate | Whether each is preliminary, current, and consistent with the issued policy | What remains subject to underwriting or issuance? |
| Prior policies and renewal notices | Carrier changes, nonrenewal, cancellation, material limit changes, and gaps | Why did the program change, and what changed with it? |
2. Confirm the insured property and policy identity
Match the named insured, ownership entity, mailing address, property address, building schedule, unit count, construction description, occupancy, and effective dates against the purchase contract, title and entity records, survey, appraisal, rent roll, and physical property evidence.
- Confirm every building, detached structure, equipment item, and location intended for review.
- Identify vacant, partially occupied, renovated, or nonconforming areas that may affect underwriting questions.
- Compare stated construction type, roof information, square footage, year built, systems, and renovations with available records.
- Record every mismatch rather than assuming it is harmless.
3. Review replacement-cost valuation and policy limits
Compare the policy limit and valuation basis with the building inventory, measurements, construction type, systems, finishes, local reconstruction conditions, demolition, debris, professional fees, inflation, and code-upgrade exposure. Market value, purchase price, tax-assessed value, and land value are not substitutes for a reconstruction-cost analysis.
Use the detailed replacement-cost valuation guide to organize valuation questions. A valuation estimate does not guarantee coverage, claim payment, contractor pricing, policy compliance, or lender approval.
4. Map every deductible and its calculation base
List flat-dollar, percentage, hurricane, named-storm, wind, flood, equipment, water, and other peril-specific deductibles. Confirm whether each applies per occurrence, per building, per location, or in an aggregate or calendar-period structure.
| Deductible question | Evidence to collect | Why it matters |
|---|---|---|
| What is the calculation base? | Policy definition, building schedule, stated values, and applicable endorsement | A percentage can produce materially different exposure depending on the defined base. |
| How does it apply across buildings? | Per-building, per-location, occurrence, and aggregate language | One event may create more than one deductible obligation. |
| Can reserves absorb the exposure? | Liquidity plan, lender reserves, operating cash, and probable-loss scenarios | A policy can exist while the deductible remains difficult to fund. |
See the multifamily insurance deductibles guide for the detailed structure review.
5. Separate flood review from wind and standard property insurance
Confirm whether flood insurance is required, proposed, or absent; whether the program is NFIP or private; which buildings, contents, equipment, and income interests are addressed; and whether waiting periods or effective-date issues could affect closing. Review FEMA mapping, map dates, elevation certificates, surveys, prior flood evidence, lender conditions, deductibles, sublimits, and exclusions.
A flood-zone label alone does not determine actual flood risk, coverage, premium, claim payment, or lender approval. Use the multifamily flood-insurance guide for the full evidence and professional-review workflow.
6. Review business income and loss-of-rents provisions
Identify the policy terminology, limit, waiting period, period of restoration, extended period, extra expense, ordinary payroll, continuing expenses, dependent-property provisions, utility-service provisions, civil-authority or ingress-egress questions, worksheets, coinsurance, agreed value, and reporting conditions.
Compare the assumptions with leases, rent rolls, concessions, delinquency, occupancy, seasonality, operating statements, tax records, lender underwriting, and restoration evidence. Projected or scheduled rent does not guarantee recoverable loss. Use the business-income and loss-of-rents guide for the detailed documentation review.
7. Identify ordinance or law exposure
Review whether the policy addresses the undamaged portion, demolition cost, debris removal, and increased construction cost caused by current codes. When the policy uses Coverage A, B, and C labels, confirm their actual definitions and limits rather than assuming the labels are universal.
Older and nonconforming buildings may create questions involving accessibility, electrical, plumbing, structural, fire-safety, energy, egress, flood-related, permit, design, and engineering requirements. Replacement-cost coverage alone does not prove these expenses are insured. Use the ordinance or law coverage guide for the focused review.
8. Reconcile loss runs, open claims, and repair evidence
Request loss runs for every requested policy period and named insured. Record claim dates, causes, status, paid amounts, reserves, denials, reopenings, and unresolved matters. Compare the record with seller disclosures, invoices, permits, photographs, inspections, engineering reports, restoration files, and property-condition findings.
- Explain missing years, carrier changes, and gaps before treating the history as complete.
- Separate claim frequency from claim severity.
- Identify open claims, unreleased recoverables, incomplete repairs, or disputed scope.
- Do not treat a clean loss run as proof that no damage or unreported event occurred.
Use the insurance loss-runs guide for the detailed claim-history workflow.
9. Reconcile lender insurance requirements
Collect the lender's insurance checklist, commitment conditions, approved-carrier or rating requirements, limits, deductibles, flood requirements, business-income requirements, ordinance or law conditions, mortgagee and loss-payee wording, evidence deadlines, and reserve requirements.
Do not assume the existing policy, seller's policy, quote, or binder satisfies the lender. Ask the lender and licensed insurance professional to resolve every difference in writing before closing.
10. Create a missing-record and unresolved-question ledger
| Issue | Status | Responsible professional | Required evidence before decision |
|---|---|---|---|
| Missing endorsement or policy form | Open / received / resolved | Licensed insurance professional | Complete issued form and written explanation |
| Building data or valuation mismatch | Open / received / resolved | Valuation, construction, engineering, and insurance professionals | Corrected inventory, measurements, estimate, and policy response |
| Open claim or uncertain repair history | Open / received / resolved | Insurance, legal, construction, engineering, and seller representatives | Loss record, claim status, repair evidence, and responsibility allocation |
| Lender condition conflict | Open / received / resolved | Lender and licensed insurance professional | Written lender acceptance and compliant evidence |
| Coverage or legal interpretation | Open / received / resolved | Licensed insurance professional and attorney | Professional interpretation of controlling documents |
11. Use a final pre-closing decision gate
- Complete policy forms and endorsements received or specifically identified as pending.
- Property schedule and named-insured details reconciled.
- Valuation basis and limits reviewed by qualified professionals.
- Deductibles mapped and liquidity implications considered.
- Flood, business-income, and ordinance or law questions documented.
- Loss runs, open claims, and repair evidence reconciled.
- Lender requirements matched to proposed evidence.
- Every unresolved issue assigned to a responsible professional with a deadline.
Know what this checklist cannot determine
This checklist does not interpret a policy, establish coverage, determine whether a cause of loss is insured, calculate a claim, predict premium or insurability, confirm reserve sufficiency, approve a carrier, verify engineering or construction condition, determine legal responsibility, or promise lender approval or closing. It is an organization and escalation tool. The controlling policy, endorsements, lender instructions, property evidence, and qualified professional review determine the answer.
Questions to resolve before relying on the insurance file
- Do we have the complete issued policy, all forms, endorsements, schedules, and current effective dates?
- Are the ownership entity, named insured, addresses, buildings, unit count, occupancy, and construction details correct?
- What valuation basis applies, and what evidence supports the limit?
- What deductibles apply to each major peril and across multiple buildings?
- What flood, business-income, and ordinance or law provisions actually apply?
- Are loss runs complete, and are any claims, repairs, reserves, or disputes still open?
- Which lender conditions remain unresolved?
- Which professional owns each open question, and what written evidence will close it?

